Command Layer · FactoryOS AI Agents

From techpack to shipped order — five AI agents running your pre-production.

FactoryOS AI Agents Suite compresses the 67% of lead time no factory currently controls. Five interconnected agents — Merchandising, Costing, Procurement, Planning and Logistics — autonomously handle 80%+ of operational decisions. Humans stay in control, intervening only on exceptions.

Meet the agents
🧮
Engineeri8 — Costing Agent
Techpack uploaded · 47 sec ago
Bill of Labour ready. 42 operations identified · total SAM: 14.62 min · 4 machine types.
Send to IE for review.
IE approval routed to Naman. BoM also ready: 18 materials, 6 trims, 2 packaging. Push to ERP costing on approval?
Ready · Confidence 94%. Outliers vs. historical: none.
Live agent · audit trail enabled
The opportunity

Three interlocking problems erode every margin you make.

Merchandising, costing, procurement and planning operate in silos with no shared system of record. The factory of the future doesn't push harder — it's connected enough to see what's hiding upstream.

🧩

Fragmented coordination

Merchandising, costing, procurement and planning operate in silos with no shared system of record — duplicated effort, missed handoffs.

Uncontrolled lead time

The raw-material procurement phase (Customer PO → RM receipt) is 67% of total lead time and managed manually — materials arrive 30–90 days late.

🔍

Visibility gaps

Factory management has no real-time view of order status, material readiness or delivery risk until it's too late to course-correct.

Meet the suite — try it live

Five specialist agents. One supervisor.

Click any agent below to play its live scenario.

🧮
Engineeri8

Costing Agent

Techpack PDF → MTM2 Bill of Labour, SAM per op, and BoM in minutes.

Quote same-day
📦
Procuri8

Procurement Agent

Auto-replenishment. Draft POs from confirmed BoMs. Validated against the Gold record.

Materials, on time
🗓
Plani8

Planning Agent

Continuously re-optimises the schedule. Pre-production gating enforced.

Real-time OTIF
📅
Coordination

Merchandising Agent

T&A calendar per order. Surfaces upstream blockers before they hit buyer dates.

No milestone missed
🚢
Coordination

Logistics Agent

Auto-generates export docs, recommends transport mode, tracks ETA.

Compliance pre-validated
🧠
Orchestration

Supervisor

Routes requests, manages multi-step state, orchestrates agent handoffs.

Human-in-the-loop
▶ Live demo — switches when you click an agent
🧮
Engineeri8 — Costing Agent
Techpack to ERP-ready costing · <1 day
Techpack received — Style HS-442.
Construction parsed · 42 operations identified · 26 materials extracted.
Generate BoL.
BoL ready. SAM total: 14.62 min. Operations bulletin available. Machine types: 4. Routing the operation bulletin to IE (Naman) for review.
And BoM?
BoM generated. 18 fabrics & trims, 6 labels, 2 packaging items. Consumption estimated from historical (similar fabric weight + silhouette). Lectra integration pending — high-accuracy mode requires marker.
Confidence: 94% · No outliers vs. historical range · Ready for ERP costing push on IE approval.
Costing · Bill of Labour
SAM total · HS-442
14.62 min
In-range vs. historical (14.1–15.4)
Turnaround time
47 sec
Target: <1 day for >90% styles
Confidence score
94%
Above auto-approval threshold (90%)
The Costing Agent decomposes garment construction into elemental operations using MTM2 reference data, then validates each output against historical SAM ranges before it can be pushed to ERP. IE in the loop on every approval.
📦
Procuri8 — Procurement Agent
VDM-validated PO preparation & replenishment
Replenishment trigger — Cotton 30/1 Combed. Stock at 2,400 kg · buffer threshold: 3,000 kg. Forecast consumption next 14 days: 4,800 kg.
Recommend a PO.
Draft PO ready. Vendor: Reliance Spinning (preferred). Quantity: 5,000 kg. Price: $3.42/kg (vs. 90-day avg $3.51). Expected RM arrival: 14 May 2026.
What's the alternate?
2 alternates from Gold record: Vardhman ($3.46/kg, lead 12 days) · Welspun ($3.39/kg, lead 18 days). Reliance recommended on lead-time + quality rating.
VDM validation: passed. Material UUID matched. PO ready for one-click approval. Plani8 will be notified of RM ETA on approval.
Procurement · VDM Validated
Stock level · Cotton 30/1
2,400 kg
Below buffer · trigger fired
Best price (vs. 90d avg)
$3.42/kg
−2.6% vs. average
Material UUID match
100%
Vector DB semantic match — Gold record
Every material record passes through the LLM Adjudicator — semantic-similarity deduplication, UUID assignment — before any PO can be written. The Vector DB layer is the data-quality firewall.
🗓
Plani8 — Planning Agent
Dynamic capacity planning & pre-production gating
Schedule re-optimised. RM ETA for PO-2241 slipped 4 days (vendor confirmed). Impact: Order HS-442 cut date pushed 16 → 20 May.
Can we hold the buyer commitment?
Two options: (A) Sequence HS-440 (in stock) ahead — saves 3 days; new cut: 17 May. (B) Expedite RM via air freight — +$2,400 cost, saves 4 days.
Recommended: Option A. Changeover cost: $180 (Line 2 setup). Net: still meets buyer ship date with $2,220 saved vs. air freight.
Notifying: Merchandising Agent (buyer comms draft) · Procuri8 (no expedite needed) · Production team (Line 2 sequence change).
Planning · Schedule Volatility
Projected OTIF · this week
94%
↑ from 89% after re-sequence
Capacity utilisation
87%
All 4 lines in plan
Cost saved · vs. expedite
$2,220
Option A — Line 2 sequence change
Plani8 doesn't just flag delays — it generates alternative schedules with explicit cost trade-offs, then notifies every downstream agent automatically once the planner approves.
📅
Merchandising Agent
T&A milestone tracking & buyer comms
T&A milestone at risk — Order HS-440. Sampling sign-off due 18 May. Currently 3 days behind.
Root cause?
Trim approval blocked. Buyer waiting on revised colour match for placket binding. Last email: 09 May, no follow-up since.
Draft a buyer comms.
Draft ready — addressed to Sarah at Buyer X, includes revised colour swatch attachment from BoM Asset Library, asks for 24-hr turnaround. Forwarding to your inbox for review.
Pipeline impact: If approved by 13 May, cut date holds. If >13 May, ship date slips by 2 days — buyer impact briefing also drafted.
Merchandising · T&A Tracking
Open T&A milestones · this week
23
2 critical · 5 warning · 16 on track
Order pipeline value
$2.4M
14 active orders · 8 in costing
Avg buyer response time
36 hr
↓ from 58 hr — auto follow-ups
Every T&A milestone is tracked against critical-path templates per garment category and buyer. The agent surfaces blockers before they become delays — and drafts the buyer email for you.
🚢
Logistics Agent
Export document automation & ETA tracking
Order HS-438 — packed. 4,200 units · 12 cartons · 1.4 CBM · gross 218 kg. Buyer terms: FOB Chittagong.
Generate the docs.
Generating: commercial invoice · packing list · shipper's letter of instruction · certificate of origin · packing declaration. All validated against buyer-country import requirements (USA). Ready in 12 sec.
Mode recommendation?
Sea recommended. Delivery deadline 06 Jun — sea ETA 02 Jun (5-day buffer). Cost: $1,840. Air alternative: $4,200, ETA 18 May. Saves $2,360.
Booking forwarded to Bondi Shipping. Container: TCNU-4421080 · vessel: MV Hanjin · ETD 17 May. Buyer will be notified on confirmation.
Logistics · Documentation
Doc generation time
12 sec
5 docs · zero re-keying
Cost saved vs. air
$2,360
Sea recommended on buffer days
Compliance pre-check
USA import requirements validated
Every export document is populated from order data and buyer-agreed Incoterms, then validated against the destination country's import requirements before any human sees it.
🧠
Supervisor
Orchestration · human-in-the-loop
Cross-agent coordination — Order HS-440.
Engineeri8: BoL approved. Procuri8: PO drafted. Plani8: schedule slot reserved.
Anything blocking?
One item. PO value $14,200 exceeds your $10K auto-approval threshold. Routing to procurement manager for one-click sign-off.
Audit trail?
Every action logged. 16 events across 3 agents · 2 human approvals · 0 silent writes. Available in audit panel.
Status: All 5 agents in sync. Order on track for buyer ship date.
Orchestration · Audit
Approvals queued
1
PO $14.2K · awaiting sign-off
Audit events
16
3 agents · 2 approvals · 0 silent writes
Confidence (multi-agent)
92%
Cross-validated against Gold record
The Supervisor never acts on its own — it routes, coordinates and waits for human approval on anything above the configured risk threshold. Every action is reviewable, reversible and logged.
Under the hood

An orchestrator / supervisor architecture, on a VDM foundation.

The data layer is deployed first — before any agent goes live. Bronze → Silver → Gold → Vector DB. No agent writes to ERP/MES until data has been validated against the Gold layer.

01 · AI LAYER

Multi-model orchestration

Anthropic Claude for reasoning & orchestration. Specialised models for SAM calculation and techpack vision. Embedding models powering the Procuri8 Vector DB.

02 · AGENT LAYER

Supervisor-managed specialists

A central supervisor routes user requests, manages multi-step state, and orchestrates handoffs. Each specialist has its own context, tools and domain knowledge.

03 · DATA LAYER

The VDM refinery

Bronze (raw) → Silver (normalised) → Gold (deduplicated UUID-mapped reference) → Vector DB (semantic search + data-quality firewall before every ERP write).

04 · INTERFACE

Chat + dashboard

Natural-language chat for queries, action triggers and approvals. Structured dashboards for KPI tiles, order tables, capacity charts. Multi-language out of the box.

05 · INTEGRATION

REST / GraphQL APIs

The VDM layer abstracts agent logic from source-system differences. ERP/MES write-backs always require explicit human approval — never silent.

06 · SAFETY

Human-in-the-loop, always

Every action is visible, reviewable and reversible. Confidence scores on every output. Risk-threshold-based approval gating. Immutable audit log for 5+ years.

Map this to your factory in 30 minutes.

We'll walk through the agents most relevant to your category and order mix — and show what a deployment timeline would look like for you.